datasheetbank_Logo
数据手册搜索引擎和 Datasheet免费下载 PDF

UPC1935 查看數據表(PDF) - NEC => Renesas Technology

零件编号
产品描述 (功能)
比赛名单
UPC1935
NEC
NEC => Renesas Technology NEC
UPC1935 Datasheet PDF : 28 Pages
First Prev 11 12 13 14 15 16 17 18 19 20 Next Last
µ PC1935
3.5 ON/OFF Control
3.5.1 Channel 1 (for step-up)
The ON/OFF signal control method of the output oscillation of channel 1 is to input the ON/OFF signal from ON1 as
shown in Figure 3-3. For channel 1, soft start or timer latch (SCP) is internally selected. Soft start is executed when the
first start signal is input. When the end of soft start is detected, the soft start select switch is turned OFF and the timer
latch circuit operates.
Figure 3-3 ON/OFF Control (channel 1 for step-up)
VO1
(Converter
output
R11
voltage)
R12
D11
ON1
Q11
CDLY
FB1
II1
+ Error amplifier
0.3 V
VREF
R1
Dead time
setting: 85 %
(internally fixed)
SCP comparator
(common to each channel)
+
Q1
0.63 V
To output stage
+
+
PWM comparator
Oscillation section
SW (common to each channel)
DLY
(1) When ON1 is high: OFF status
Q11: ON DLY pin: Low level Output duty of PWM comparator: 0 %
D11: ON II1 pin: High level FB1 output: Low level
(2) When ON1 is low: ON status (start up)
Q11: OFF CDLY is charged in the sequence of [VREF R1 SW DLY pin CDLY] Soft start
D11: OFF II1 pin: Low level FB1 output: High level
(3) When ON1 goes high again after start up (SW: OFF): OFF status
Q11: ON DLY pin: Low level (Nothing happens because SW is OFF.)
D11: ON II1 pin: High level FB1 output: Low level PWM comparator output duty: 0 %
Converter output voltage (VO1) drops.
Caution Even if start up is executed by making ON1 low again after (3), soft start is not executed because the
soft start select switch (SW) remains OFF. To execute soft start of channel 1 again, drop VCC to 0 V
once.
Data Sheet G13418EJ3V0DS00
17

Share Link: 

datasheetbank.com [ Privacy Policy ] [ Request Datasheet ] [ Contact Us ]